Dismiss Notice

In the upcoming weeks mod approvals could be slower than normal.
Thank you for your patience.

Alpha Foshan276 Road 0.34

Guangdong's "Quality Public Transport, Smooth Travel in the South China Sea"

Tags:
  1. wsalj
    Foshan Route 276 is operated by Lili Branch of Foshan Nanhai Foguang Bus Co., Ltd.
    The direction of this line is the North Gate Terminal ↔ of Oriental Plaza Luo Chongwei Passenger Station, with 33 vehicles on the whole line, the models are Wisdom Teng FDE6101PBABEV02, CRRC TEG6105BEV13, Yangtze River FDC6850PBABEV05, Guizhou GK6851GBEV3, and the one-way running time is 80-120 minutes.
    Operating hours: Oriental Plaza North Gate Bus Terminal: 06:00-22:30, Lo Chong Wai Bus Terminal: 06:00-22:30.
    Frequency: 8-20 minutes.
    According to the requirements of the joint meeting of Guangzhou and Foshan, the station signs of this line in the two cities of Guangzhou and Foshan, as well as the vehicle compartment guide map and three plates show Foshan 276 Road.









    On September 30, 2005, the opening of this line, for the first batch of entry into the territory of Guangzhou, one of the lines operated by Foshan public transport enterprises, the initial direction of "Luo Chongwei - Oriental Plaza", operated by Hengtong passenger transport, with Yutong ZK6891HG, the use of unmanned ticketing ladder section charging mode, the whole fare of 6 yuan. [1] [2] [3]
    Oriental Plaza Bus Terminal is located near the North Gate of Oriental Plaza, and Luo Chongwei Bus Terminal is located at the bus stop at the entrance of the headquarters of Guangzhou Second Bus Co., Ltd.
    In 2010, Foguang Group adjusted its business, and the operation rights of bus lines, including this line, were handed over to Foguang Bus to operate.
    On August 25, 2010, the last train in both directions was extended to 22:30. [4]
    On September 6, 2013, in order to strengthen the connection between Shafeng 3rd Road and Luo Chongwei Passenger Station, the line added a stop at "Shafeng 3rd Road" station in both directions. [5]
    On March 24, 2014, the Fumin Road Bus Hub Station was officially opened, and the Foshan terminal of the line was adjusted to this station. [6]
    On January 1, 2015, the yellow bus and green bus in Nanhai District carried out the ticket system fare reform, and the fare of this line was adjusted to 4 yuan for one ticket, and the Lingnan Pass and Guangfo Pass card were swiped to enjoy a 7% discount. [7]
    On September 10, 2015, the bus hub station of Fumin Road was closed due to the upgrading of the old city of Foshan, and the terminal of the Foshan end of the line was relocated to the north gate of Oriental Plaza.
    In January 2020, part of the buses on this line were replaced by CRRC TEG6105BEV13.
    On April 20, 2020, part of the bus allocation of this line was replaced with Wisdom FDE6101PBABEV02.
    On January 1, 2021, one back-up car, Jinlv XML6115JHEVA5CN, was transferred to Road 227A of Qiaojiang Branch, completing the full pure electrification of the line.
    On March 1, 2021, the Guangzhou terminal of the line will be adjusted to Luo Chongwei Passenger Station. [8]
    On November 8, 2022, the "Nanhai Hospital" station was renamed as the "Nanhai District General Hospital (Guicheng Hospital)" station. [9]

    Images

    1. 800px-276_FDE6101PBABEV02.jpg
    2. 800px-276_TEG6105BEV13.jpg
  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.
    Dismiss Notice